The piling barge and crane. New piles are being put in for the new slipway to replace the old one. |
Sunday, 16 September 2012
One of the things I came back to - - - no access to the slipway for dinghy sailing.
The old slipway is used as a work platform for doing the piling. It could not be left until after the end of sailing season incase the banging disturbs the - - - - - birds! So there is no more racing this year.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment